PENENTUAN KEBIJAKAN PERSEDIAAN SPARE PART JOK MOBIL DENGAN PENDEKATAN METODE ABC, ECONOMIC ORDER QUANTITY (EOQ), PERIOD ORDER QUANTITY (POQ) UNTUK MENURUNKAN BIAYA PERSEDIAAN PT. XYZ

Authors

  • Bintang Naufal Fauzan Sekolah Tinggi Teknologi Wastukancana Purwakarta
  • Asep Hermawan Sekolah Tinggi Teknologi Wastukancana Purwakarta
  • Rizky Fajar Ramdhani Sekolah Tinggi Teknologi Wastukancana Purwakarta

Abstract

PT. XYZ is a manufacturing company in the automotive industry that produces car seats. This thesis explains how to determine the amount of spare part inventory that is more economical and efficient. The technique for determining inventory in this research is determining the most economical price (Economic Order Quantity), safety stock, reordering (Reorder Point), and the number of orders per period (Period Order Quantity). Based on the results of research using the EOQ method, the number of spare part purchases was 112,149 pieces, the economic inventory cost (EOQ) was IDR 3,350,290 for reorders per period (ROP), with a quantity of 139,595 pieces. The quantity per period (POQ) is around 99 orders with a total quantity of 532,372.40 pieces, for inventory costs according to the period (POQ) is IDR 3,195,422. Conclusions and this research shows that the order quantity is more economical compared to the method used by PT XYZ.

 

 

Downloads

Download data is not yet available.

References

Aladin, Monicha Safira Chaerunisa, and Sarikadarwati, ‘Penerapan Metode Activity Based Costing Dalam Penetapan

Harga Jual Produk’, Jurnal Ekonomi, Bisnis, Akuntansi Dan Sistem Informasi (EKSISTANSI), 10.2 (2021), 1–7

Ramadhani, Albila Ababil, and Susatyo Nugroho, ‘Pengendalian Persediaan Sparepart Mesin Produksi Pada PT

Semen Gresik Pabrik Rembang Menggunakan Metode EOQ Dan POQ’, Prosiding SENIATI, 6.1 (2022), 199–206

Rahman, T., & Rudihartati, L. (2020, October). Analisis Logistik Berbasis Biaya Persediaan Rantai Motor Revo Di PT. Astra Internasional Depo Lampung. In Prosiding Seminar Nasional Darmajaya (Vol. 1, pp. 186-193).

Pratiwi, Dewi Nita, and Saifudin Saifudin, ‘PENERAPAN METODE ANALISIS ABC DALAM PENGENDALIAN PERSEDIAN BAHAN BAKU PADA PT.DYRIANA (Cabang Gatot Subroto)’, Solusi, 19.1

(2021), 60–75

Agatha, Arselia, and Theresia Sunarni, ‘Analisa Pengiriman Optimal Dengan Metode Economic Order

Quantity ( Eoq ) Kondisi Backorder Sme Kemplang Badak Panggang’, Jurnal Tekno, 17.April (2020),

–44

Ciswondo, Ciswondo, and Anastasia Lidya Maukar, ‘Pengendalian Persediaan Bahan Baku Impor Dengan

Menggunakan Metode EOQ Probabilistik Pada Perusahaan Cat Industri’, JIE Scientific Journal on

Research and Application of Industrial System, 4.2 (2019), 100–112

Faldin, Oswaldus, Nurdam Buhaerah, Harry Yulianto, Sekolah Tinggi, Ilmu Ekonomi, dan Ypup Makasar, ‘Komparasi Metode Lfl (Lot for Lot) Dengan Metode Eoq (Economic Order Quantity) Terhadap Model Mrp

(Material Requirement Planning) Pada Ahass 01762 Kencana Motor Di Makassar’, MACAKKA Journal

STIE YPUP Makassar 391 MACAKKA, 01.03 (2020), 391–98

PENGENDALIAN PERSEDIAAN SEMEN DENGAN METODE ECONOMIC ORDER QUANTITY ( EOQ) PROBABILISTIK PADA PT . PRIMA KARYA MANUNGGAL’, 2019, 2023, 109–13

Downloads

Published

2024-09-30

How to Cite

Bintang Naufal Fauzan, Asep Hermawan, & Rizky Fajar Ramdhani. (2024). PENENTUAN KEBIJAKAN PERSEDIAAN SPARE PART JOK MOBIL DENGAN PENDEKATAN METODE ABC, ECONOMIC ORDER QUANTITY (EOQ), PERIOD ORDER QUANTITY (POQ) UNTUK MENURUNKAN BIAYA PERSEDIAAN PT. XYZ. Journal of Management and Industrial Engineering (JMIE), 3(2), 1–13. Retrieved from https://jurnal.sttnlampung.ac.id/index.php/jmie/article/view/133